Construction and Development of Transportation Infrastructures Company Studies on Southern part of Aprin-Shourab double-track railway Studies on the Arak-Khomeyn-Golpaygan-Meymeh-Esfehan railway Supervision on roadbed of Malayr-Hamedan railway lot 1,2,3 supervsion on road bed operation of Shiraz-Boushehr-Asalouyh railway lot 9,10,11 Studies on antenna plan of connecting Kaviyan industrial town to railway network through Shahid Motahhari station Studies on the Shiraz-Boshehr-Asalouyh railway lot2 Supervision on Miyaneh-Bostanabaad-Tabriz railway lot6,7 Studies on the first and second phase of Chabahar -fahraj (lot6) railway Supervision on executive operation of Bafgh-Mashhad railway roadbed lot6,7 (length about 108.410 km) Studies on part 1&2 of second phase of Garmsar-Badrood railway lot3 (length about 64 km) View Count: 10 20 50 100 All Items Page 1 From 5 2 3 4 5 « Previous Next » The Railways of The Islamic Republic of Iran Designing and executing activities to double –track railway of Nazarabad-Shamsi(foundation,bridge construction,superstructure) Studies and build of secend lane of Gazvin-Zanjan railway Studies on Retrofit of Shoorabad-Badrood railway bridges (lot1 ) Khorasan Razavi Road and Urban Development Department Refine studies (type D-A) on Dooghaei-Soltanabaad-Sabzehvar Studies on refinement and provision of final justification report and detailed plan (Fariman Chakhmag)and executing special buildings and interchange intersections of Mashad Fariman road Fariman bypass- Supervision on constructing rural roads of Ghochan city Studies on securing Qouchan –Imamgholi road (Qouchan beltway) Supervision on executive operation of securing Qouchan –Imamgholi road (Qouchan beltway) Supervision on refinement of Fariman-Sangbast-Mashhad Compeleting of studies on Mashhad-Fariman road Supervision on executive operation of asphalt overlay of Baghche-neyshaboor road Supervision on refinement operation of Fariman-Chakhmagh Supervision on executive operation of asphalt overlay Baghche-neyshaboor and ghadamgah Dorood (51km) View Count: 10 20 50 100 All Items Page 1 From 2 2 « Previous Next » North Khorasan Road and Urban Development Department Supervision on intersaction of Bojnoord southern ring road with Bojnoord-Beshghardash road(Beshghardash intersaction) Supervision on constructing rural roads of Esfarayn city Studies on the first and second phase of Bojnoord southern ring road Supervision on Maneh and Samalghan rural road Supervision on executive operation of kerik intersaction Supervision on 2nd part of the 3rd phase (workshop supervision)of preparation of lands for co-operatives housing of Mehrshirvan Supervision on asphalt Overlay of Chaman bid -Jajarm road Studies on the first and second phase of securing accident prone locations of Kerik residential area supervion on amendment of accident prone locations of Chaman bid-Ghareseylab Studies on the second phase of some accident prone locations of Mashhad - Bojnoord-Golestan jungel View Count: 10 20 50 100 All Items Page 1 From 2 2 « Previous Next » Iranshahr Road and Urban Development Department Supervision on executive operation of Namouriyan bridge and Iranshahr-Mehrestan asphalt overlay Supervision on constructing of Khash-Iranshahr 2th lane (lot4) Supervision on Refinement and asphalt Overlay of Jakigur-Chabahar road and The remaining operations of Rimdan bridge and asphalt overlay of Jakigur-Ghasreghand-Bent Supervision on Refinement and asphalt Overlay of Nikshahr-Chabahar and Iranshahr-Khash and Iranshahr-Bam road Refine studies (type D-A) on the first and second phase of Iranshahr-Zaboli road studies on the first and second phase of Koorkalkaliha bridge Supervision on constructing of Kajoo bridge located on Jakigur-Nikshahr road Supervision on executive operations of constructing Depkoor –Firoozabad bidges and variant of Badkesh pass at Jakigvar-Chabahar road Supervision on 1- Supplementary Operations of Pishin bridge 2-constracting of Pishin vaeiants 3-refinement of Shirgovaz variant located on Jakigur-Chabahar Refine studies (type D-A) on the first and second phase of Iranshahr-Zaboli road View Count: 10 20 50 100 All Items Page 1 From 4 2 3 4 « Previous Next » Tehran Road and Urban Development Department Supervision on refinement operation and asphalt Overlay of Tehran-Qom highway Estern band Supervision on refinement operation and asphalt Overlay of Malard-Shahriyar road Supervision on refinement operation and asphalt Overlay of main road and rural road of Firoozkooh Supervision on asphalt Overlay of Qom old road between Tehran - Hasanabaad studies on the first and second phase of Boomehen bridge widening on Boomehen blv Supervision on repairment and asphalt Overlay of ghochak pass-Lashkarak Sq-Oushan Supervision on repairment and asphalt overlay of Roodehen-Gilavand road and execution of Aminabad slow band and Ovzaneh pass Supervision on repairment and asphalt Overlay of Tehran-Qom freeway(west band of lot 1 and east band of lot 2 West Azarbaijan Road and Urban Development Department Supervision on constructing operation of Bonab-Mohammadyar -Naghadeh Studies on the first and second phase of Naghadeh Y interection intersection and Heydarabaad intersection on Orumiyh-Mahabad road Supervision on operations for widening and constructing second band of Urumieh-Mahabad expressway lot 1 Supervision on executive operation of asphalt overlay of Orumiyh -Naghadeh Y interection lot1 length 37Km Refine studies of Oroumiyh-Miyandoab lot1 (length about 70 km) Kerman Road and Urban Development Department Supervision on constructing bridges of Jangal Abad and Sarjaz Zanjan Road and Urban Development Department Refine studies (type B-D) on the first and second phase of Zanjan Gas power plant road Studies on the first and second phase of Zanjanrood bridge studies on the first phase of Zanjan police road-Tarom Y interection Studies on the first phase of saremsaghlo rural road with Zanjan-airport main road intersection Studies on the first and second phase of Noorin intersection bridges Studies on the first and second phase of Zanjan Northern ring road and Studies on first intersection and end intersection of pass Supervision on asphalt Overlay and Refinement of Dehjalal rural road and Dotapeh sofla and Noorabaad(length about 64 km) Supervision on refinement operation of Zanjan police road-Tarom Y interection 4 lane road Refine studies (type B-D) on the first and second phase of Zanjan police road-Tarom Y interection Studies on the first and second phase of Takestan-َAbhar road with Abhar Northern ring road intersection (noorin intersection) View Count: 10 20 50 100 All Items Page 1 From 2 2 « Previous Next » Municipal Development of Tehran Studies on the second phase of seismic refinement of 3 bridges of Tehran , 2nd pre-phase studies and supervision on ancillary services Supervision on third part of executive operation of Emam Ali highway between north of Bakhtar messy to Matlabnejad Avenue studies on the first and second phase of Emam Ali highway road and Intersections Supervision on operations for widening Eshtehard road and asphalt overlay of Mahdasht-Eshtehard road