English
فارسی
Home
Projects
Projects By Activity Field
Projects by Employers
Projects Separated by Studies, Supervision and EPC
Projects by time decade
About RahAhanRah
Activity
»
Projects
»
Projects Separated by Studies, Supervision and EPC
Study Projects
Studies on the Arak-Khomeyn-Golpaygan-Meymeh-Esfehan railway
Studies on antenna plan of connecting Kaviyan industrial town to railway network through Shahid Motahhari station
Studies on the Shiraz-Boshehr-Asalouyh railway lot2
Studies on the first and second phase of Chabahar -fahraj (lot6) railway
Studies on part 1&2 of second phase of Garmsar-Badrood railway lot3 (length about 64 km)
Studies on part 2 of second phase of Sirjan railway roadbed (length about 18 km)
Refine studies on Tehran -Qom railway lot1 Between Javadiyh to uprin
Studies on second phase of Ganjgah-Hashtchin to Ghezel ozan valley road (length about 110 km)
studies on first phase of Gonjeshgah-Hashtchin-Dare ghezel ozan road lot 1(length about 110 km)
Studies on final justification and detailed designing primary intersection Qazvin-Alamoot-Tonekabon road
Studies on the first and second phase of Takestan silo road with Takestan silo railway non-level intersection
Studies on the first and second phase of Naghadeh Y interection intersection and Heydarabaad intersection on Orumiyh-Mahabad road
View Count:
12
24
60
120
All Items
Page 1 From 7
2
3
4
5
6
7
Next »
EPC Projects
Designing and executing activities to double –track railway of Nazarabad-Shamsi(foundation,bridge construction,superstructure)
Studies and build of secend lane of Gazvin-Zanjan railway
Studies on Retrofit of Shoorabad-Badrood railway bridges (lot1 )
Supervision Projects
Studies on the Arak-Khomeyn-Golpaygan-Meymeh-Esfehan railway
Studies on antenna plan of connecting Kaviyan industrial town to railway network through Shahid Motahhari station
Studies on the Shiraz-Boshehr-Asalouyh railway lot2
Studies on the first and second phase of Chabahar -fahraj (lot6) railway
Studies on part 1&2 of second phase of Garmsar-Badrood railway lot3 (length about 64 km)
Studies on part 2 of second phase of Sirjan railway roadbed (length about 18 km)
Refine studies on Tehran -Qom railway lot1 Between Javadiyh to uprin
Studies on second phase of Ganjgah-Hashtchin to Ghezel ozan valley road (length about 110 km)
View Count:
8
16
40
80
All Items
Page 1 From 11
2
3
4
5
6
7
8
9
10
Next »