Study Projects
studies on the first and second phase of Zabol beltway
studies on the first and second phase of Danesh Y intercetion and bridge
Refine studies (type c) on Khash Cement factory and mine Connecting road (length about 45 km)
studies on the Zabol-Zahak four lane main road
studies on the eastern beltway of Zahedan city
studies on the first and second phase of Zabol-Zahedan technical structure
studies on the first and second phase of Zabol-Dostmohamad
studies on the first and second phase of Talesiyah-Dashtak
Refine studies on the main road to four lain high way of zabol-Zahedan
Studies on the first and second phase of Mohammadabad accident prone locations amendment
Refine studies (type A) on Shourgaz-Zahedan road (length 210km)
Preliminary studies of Zabol-Zahedan road Increase capacity
View Count:
12
24
60
120
All Items
« Previous
1
2
3
Page 4 From 7
5
6
7
Next »
EPC Projects
Designing and executing activities to double –track railway of Nazarabad-Shamsi(foundation,bridge construction,superstructure)
Studies and build of secend lane of Gazvin-Zanjan railway
Studies on Retrofit of Shoorabad-Badrood railway bridges (lot1 )
Supervision Projects
studies on first phase of Gonjeshgah-Hashtchin-Dare ghezel ozan road lot 1(length about 110 km)
Studies on final justification and detailed designing primary intersection Qazvin-Alamoot-Tonekabon road
Studies on the first and second phase of Takestan silo road with Takestan silo railway non-level intersection
Studies on the first and second phase of Naghadeh Y interection intersection and Heydarabaad intersection on Orumiyh-Mahabad road
Supervision on executive operation of asphalt overlay of Orumiyh -Naghadeh Y interection lot1 length 37Km
Refine studies of Oroumiyh-Miyandoab lot1 (length about 70 km)
Preliminary studies on Four lane road of Borazjan-konar takhteh (length about 83 km)
Refine studies (type B-D) on the first and second phase of Zanjan Gas power plant road