English
فارسی
Home
Projects
Projects By Activity Field
Projects by Employers
Projects Separated by Studies, Supervision and EPC
Projects by time decade
About RahAhanRah
Activity
»
Projects
»
Projects Separated by Studies, Supervision and EPC
Study Projects
Refine studies on Iranshahr-Bazman-Rigan-Rostamabaad road lot2
Studies on second phase of Mirjaveh ring road
studies on second phase of mirjaveh main road to Pakistan border
Studies on the first and second phase of Bojnoord southern ring road
Studies on the first and second phase of securing accident prone locations of Kerik residential area
Studies on the second phase of some accident prone locations of Mashhad - Bojnoord-Golestan jungel
Refine studies (type D-A) on Jajarm-Amirabaad Y intersection
Refine studies (type C) on Emam gholi-Daregaz old road (allahoakbar pass)
Preliminary studies Torbat heydariyh-Birjand road between Gonabad-Birjand (length 190 km)
Preliminary studies on Ghochan-Bam road
Studies on the first and second phase of Jajarm-Sankhast main road (length about 55 km)
Studies on second phase of Esfarayn-Sankhast road (length about 58 km)
View Count:
12
24
60
120
All Items
« Previous
1
2
3
4
Page 5 From 7
6
7
Next »
EPC Projects
Designing and executing activities to double –track railway of Nazarabad-Shamsi(foundation,bridge construction,superstructure)
Studies and build of secend lane of Gazvin-Zanjan railway
Studies on Retrofit of Shoorabad-Badrood railway bridges (lot1 )
Supervision Projects
Studies on the first and second phase of Zanjanrood bridge
studies on the first phase of Zanjan police road-Tarom Y interection
Studies on the first phase of saremsaghlo rural road with Zanjan-airport main road intersection
Studies on the first and second phase of Noorin intersection bridges
Studies on the first and second phase of Zanjan Northern ring road and Studies on first intersection and end intersection of pass
Refine studies (type B-D) on the first and second phase of Zanjan police road-Tarom Y interection
Studies on the first and second phase of Takestan-َAbhar road with Abhar Northern ring road intersection (noorin intersection)
Refine studies (type C) on Zanjan Gas power plant access road to Zanjan-ghazvin highway
View Count:
8
16
40
80
All Items
« Previous
1
2
Page 3 From 11
4
5
6
7
8
9
10
Next »