English
فارسی
Home
Projects
Projects By Activity Field
Projects by Employers
Projects Separated by Studies, Supervision and EPC
Projects by time decade
About RahAhanRah
Activity
»
Projects
»
Projects Separated by Studies, Supervision and EPC
Study Projects
Studies on the first and second phase of constracting Iranshahr ring road and Iranshahr intersections
Refine studies of Jakigur-Gasreghand-Nikshahr
Studies on the first and second phase of Rimdan bridge
Studies on the first and second phase of Damen bridge
studies on the second phase of Gang bridge
Studies on the first and second phase of Jakigour bridge located on Iranshahr -Chabahar road
Refine studies type D-A refinement and amendment of accident prone locations Jakigoor-Chabahar
Refine studies (type A) on Chabahar-Konarak (length 55km)
Refine studies (type D-A) of Jakigur-Chabahar road
View Count:
12
24
60
120
All Items
« Previous
1
2
3
4
5
6
Page 7 From 7
EPC Projects
Designing and executing activities to double –track railway of Nazarabad-Shamsi(foundation,bridge construction,superstructure)
Studies and build of secend lane of Gazvin-Zanjan railway
Studies on Retrofit of Shoorabad-Badrood railway bridges (lot1 )
Supervision Projects
Studies on the first and second phase of Neyshaboor-Mashhad-_Torbat heydariyh intersection (baghche intersection
Studies on the first and second phase of constructing Mashhad -Fariman 2nd band
Studies on second phase of Abgho-Neyshaboor hightway (length about 21 km)
Refine studies of Ferdous-Gonabad (length about 70 km)
Refine studies (type D-A) on the first and second phase of Iranshahr-Zaboli road
studies on the first and second phase of Koorkalkaliha bridge
Refine studies (type D-A) on the first and second phase of Iranshahr-Zaboli road
Studies on the first and second phase of Malouran bridge located on Nikshahr-Bent road
View Count:
8
16
40
80
All Items
« Previous
2
3
4
5
6
7
8
Page 9 From 11
10
11
Next »